[6bone] power problems amsterdam

Hans Goes hans.goes@wcom.com
Wed, 6 Nov 2002 23:08:27 +0000 (GMT)


Hi,

Due to power problems in Amsterdam our 6bone router (6b1.ams7.alter.net)
went down.

80% of the NUON power network in Amsterdam and surroundings went down.

We are currently building a native backbone between amsterdam, london and
frankfurt. We are also moving to AS12702 for our ipv6-network in EMEA.
Soon we hope to offer you a 2nd tunnel to a box in a different country.

Good night,

Hans Goes

WorldCom
EMEA Network Operations
Joan Muyskenweg 24
1096 CJ Amsterdam

Tel: +31 20 7112428 (Fax: 2455)
V-Net: 711 2428
http://www.wcom.com/nl/