pTLA request for T-NET - review closes 11 February 2002
Bob Fink
fink@es.net
Tue, 15 Jan 2002 17:08:19 -0800
6bone Folk,
T-NET has requested a pTLA allocation and I find their request fully
compliant with RFC2772. The open review period for this will close 11
February 2002 (an extended time as I will be on travel 24 Jan - 10 Feb).
Please send your comments to me or the list.
<http://whois.6bone.net/cgi-bin/whois?T-NET>
<http://www6.asterix.gimp.hu>
Thanks,
Bob
===
>Hi Bob,
>
>I'd like to request a pTLA for T-NET, please find relevant info below.
>
>Sincerely,
>
>Krisztian Vago
>
>-------------------------------------------------------------------------
>7. Guidelines for 6Bone pTLA sites
>
> The following rules apply to qualify for a 6Bone pTLA allocation. It
> should be recognized that holders of 6Bone pTLA allocations are
> expected to provide production quality backbone network services for
> the 6Bone.
>
> 1. The pTLA Applicant must have a minimum of three (3) months
> qualifying experience as a 6Bone end-site or pNLA transit. During
> the entire qualifying period the Applicant must be operationally
> providing the following:
>
>T-NET is in 6bone since March of 2001
>
>
> a. Fully maintained, up to date, 6Bone Registry entries for their
> ipv6-site inet6num, mntner, and person objects, including each
> tunnel that the Applicant has.
>
>ipv6-site: T-NET
>origin: AS1955
Insered explanation of use of AS1955
>HUNGARNET is an association and also the computer network of Hungarian
>institutions ofhigher education, research and development, libraries and
>other public collections.HUNGARNET as an association represents Hungary
>in the international networking organizations.
>MADNET is a network at Marton Aron Dormitory. We have five dormitories in
>Hungary and we have more or less 9000-10000 students.
>Our network is a very special network in Hungary.
>We are belong to Computer and Automation Research Institute, Hungarian
>Academy of Sciences network (SZTAKI) and we are connected via IIF
>(National Information Infrastucture Development Program)
>We are the only network in Hungary which is in favour Ministry of Culture
>and Education.
>We are totaly state-owned network and our projects are spoonfeeded. Via
>IIF (and SZTAKI) we are authorized using ASn 1955 for IPv6 activites in
>6Bone.
End insert
>descr: T-NET Project
> Budapest, Hungary
>country: HU
>prefix: 3FFE:400:1090::/48
>prefix: 3FFE:8120:FFFD::/48
>prefix: 3FFE:1001:560::/48
>prefix: 3FFE:200:45::/48
>application: ping 6bone-gw.asterix.gimp.hu
>application: www www.ipv6.asterix.gimp.hu
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu ->
>6bone.uni-muenster.de JOIN BGP4+
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu ->
>6bone-gw.zapor-u.gtnet.hu ZAPOR-U BGP4+
>tunnel: IPv6 in IPv6 6bone-gw.asterix.gimp.hu -> asterix.mad.hu
>ASTERIX BGP4+
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu ->
>holub.satimex.tvnet.hu FAKONET STATIC
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu -> mail.ithink.hu
>FAKONET STATIC
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu ->
>parbb1.routers.fr.fastnetxp.net FASTNETXP BGP4+
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu ->
>6bone-gw.ipv6.sics.se SICS STATIC
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu -> ns.bgyarmat.hu
>BGYARMAT STATIC
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu -> gw.6b0ne.hu PAMPI BGP4+
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu -> cern-atm7.cern.ch
>CERN BGP4+
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu ->
>lon2-dr61.v6.eu.ntt.net TLA-2001 STATIC
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu ->
>6bone-gw1.edisontel.it EDISONTEL BGP4+
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu -> 6bone.ircnet.hu
>GTNET BGP4+
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu -> rtr1.ipv6.he.net
>HURRICANE BGP4+
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu -> rap.viagenie.qc.ca
>VIAGENIE BGP4+
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu -> 6bone-gw3.cselt.it
>CSELT BGP4+
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu -> 6b1.ams7.nl.uu.net
>NLNET BGP4+
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu ->
>gep18-1762.nyircatv.broadband.hu D-BOX STATIC
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu ->
>server.komjata-koll.sulinet.hu DR-AGON STATIC
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu -> puffi.pszfb.hu
>PUFFI-NET STATIC
>tunnel: IPv6 in IPV6 6bone-gw.asterix.gimp.hu -> ipv6.bitchx.hu TEMA
>BGP4+
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu ->
>B945-5F50.newrange.tvnetwork.hu KV1-6BONE BGP4+
>tunnel: IPv6 in IPv4 6bone-gw.asterix.gimp.hu ->
>maximus.linuxnetwork.hu LINUXNETWORK6 STATIC
>contact: TNET1-6BONE
>contact: TTN1-6BONE
>contact: PR3-6BONE
>contact: SS9-6BONE
>remarks: FreeBSD router running MRT routing daemon
>remarks: ipv6-site is operational
>remarks: primary DNS server ns1.asterix.gimp.hu is operational
>remarks: secondary DNS server ns2.asterix.gimp.hu is operational
>url: http://www.ipv6.asterix.gimp.hu
>mnt-by: MNT-T-NET
>changed: vagok@asterix.direct.hu 20011227
>changed: vagok@asterix.gimp.hu 20020112
>source: 6BONE
>
>
>
> b. Fully maintained, and reliable, BGP4+ peering and connectivity
> between the Applicant's boundary router and the appropriate
> connection point into the 6Bone. This router must be IPv6
> pingable. This criteria is judged by members of the 6Bone
> Operations Group at the time of the Applicant's pTLA request.
>
>We have BGP connection with JOIN CERN CSELT NLNET EDISONTEL VIAGENIE ...
>
>Our router (6bone-gw.asterix.gimp.hu) is IPv6 pingable.
>
> c. Fully maintained DNS forward (AAAA) and reverse (ip6.int)
> entries for the Applicant's router(s) and at least one host
> system.
>
>
>host -t aaaa 6bone-gw.asterix.gimp.hu
> 6bone-gw.asterix.direct.hu IPv6 address 3ffe:400:1090:0:a00:36ff:fe64:6903
> 6bone-gw.asterix.direct.hu IPv6 address 3ffe:8120:fffd:0:a00:36ff:fe64:6903
>
>host -t ptr
>3.0.9.6.4.6.e.f.f.f.6.3.0.0.a.0.0.0.0.0.0.9.0.1.0.0.4.0.e.f.f.3.ip6.int
> 3.0.9.6.4.6.e.f.f.f.6.3.0.0.a.0.0.0.0.0.0.9.0.1.0.0.4.0.e.f.f.3.ip6.int
> domain name pointer 6bone-gw.asterix.gimp.hu
>
>primary DNS server ns1.asterix.gimp.hu
>secondary DNS server ns2.asterix.gimp.hu
>
> d. A fully maintained, and reliable, IPv6-accessible system
> providing, at a mimimum, one or more web pages, describing the
> Applicant's IPv6 services. This server must be IPv6 pingable.
>
>We have IPv6 www (www6.asterix.gimp.hu) ftp (ftp6.asterix.gimp.hu),
>telnet, and pop3 services.
>
> 2. The pTLA Applicant MUST have the ability and intent to provide
> "production-quality" 6Bone backbone service. Applicants must
> provide a statement and information in support of this claim.
> This MUST include the following:
>
> a. A support staff of two persons minimum, three preferable, with
> person attributes registered for each in the ipv6-site object
> for the pTLA applicant.
>
> contact: PR3-6BONE
> contact: TTN1-6BONE
> contact: SS9-6BONE
>
> b. A common mailbox for support contact purposes that all support
> staff have acess to, pointed to with a notify attribute in the
> ipv6-site object for the pTLA Applicant.
>
>
>person: T-Net Project Team
>address: Kunigunda u.35 B-436
>address: 1037 Budapest
>address: Hungary
>phone: +36 20 9357523
>e-mail: ipv6@asterix.gimp.hu
>nic-hdl: TNET1-6BONE
>notify: ipv6@asterix.gimp.hu
>mnt-by: MNT-T-NET
>changed: auto-dbm@whois.6bone.net 20011029
>changed: vagok@asterix.gimp.hu 20020112
>source: 6BONE
>
> 3. The pTLA Applicant MUST have a potential "user community" that
> would be served by its becoming a pTLA, e.g., the Applicant is a
> major provider of Internet service in a region, country, or focus
> of interest. Applicant must provide a statement and information in
> support this claim.
>
>We have five dormitories in Hungary which connected via us to
>IPv6. Our dormitories have relationship with:
>
>ELTE - Eotvos Lorand University of Sciences
>BMF - Technical College of Budapest
>PSZFB - College of Finance and Accountancy
>PTE - Pecs University
>
>Now there is two college (PSZFB, BMF - Kando - ) which are connected to
>IPv6 network via us. We have IPv6 connection with SULINET (solution for
>inernet access to primary and high schools). And we have a few private
>tunnels.
>
>We are planing building IPv6 connection with the other universities as
>well. Otherwhise we offer connection to IPv6 everyone who would like to
>join. Other small projects (GTNET, PAMPI, TEMA) will be integrated to
>T-NET in the near future.
>
> 4. The pTLA Applicant MUST commit to abide by the current 6Bone
> operational rules and policies as they exist at time of its
> application, and agree to abide by future 6Bone backbone
> operational rules and policies as they evolve by consensus of the
> 6Bone backbone and user community.
>
>We agree with any current and any future 6Bone operational rules and
>policies.
>
> 8. 6Bone Operations Group
>
> The 6Bone Operations Group is the group in charge of monitoring and
> policing adherence to the current rules. Membership in the 6Bone
> Operations Group is mandatory for, and restricted to, sites connected
> to the 6Bone.
>
> The 6Bone Operations Group is currently defined by those members of
> the existing 6Bone mailing list who represent sites participating in
> the 6Bone. Therefore it is incumbent on relevant site contacts to
> join the 6Bone mailing list. Instructions on how to join the list are
> maintained on the 6Bone web site at < http://www.6bone.net>.
>
>I have joined the mailinglist.
>
>-------------------------------------------------------------------------------